Production plant in Lagos, Nigeria

GFA 37,200 m²

Services

  • Tendering and procurement
  • Value engineering
  • Power house design


Near Lagos, a production and logistics centre with fabrication buildings and a power station were constructed for a global manufacturer of consumer goods.

Forthcoming stages of the project will see additional production and storage facilities added for further ranges of products by the client. The relevant measures were already implemented in the first stage of the project.

The storage and fabrication buildings, as well as the adjoining office complex were built using an economical steel construction system.

The client’s particular requirements with regard to air-conditioning in the production area had to be adhered to.

A conventional-design gas turbine power station ensures the electricity supply.

LEED Certification

In August 2015, the production plant in Lagos was awarded the internationally recognised LEED certification in Silver for Leadership in Energy and Environmental Design in the “New Construction” category.